Permit Application Information

Image of Downtown Los Angeles at sunset

Below are applications and information for permits requiring plan check.

To save time, fill out the application before visiting an LADBS office.

ID   Title  
IB/P/EC 2017-005 Rules and Regulations for LADBS Testing Laboratories View
IB/P/EC 2020-002 Procedures for Recognized Testing Agencies Performing Field Services View
IB/P/EC 2017-013 Electrical Equipment (Product) Approval Requirements View
IB/P/EC 2017-010 Poles and Temporary Construction Power View
IB/P/EC 2017-006 Permit Fees for Solar Photovoltaic Microinverters View
IB/P/EC 2017-011 Communication Public Utility Systems View
IB/P/EC 2017-003 Multi-Building Complexes Electrical Plan Check Required View
IB/P/EC 2017-004 Inspection of Elevator Wiring View
IB/P/BC 2017-120 Interim General Policy for Plan Check Time Extension View
IB/P/BC 2020-125 Historic Broadway Commercial Reuse Bringing Back Broadway View
IB/P/BC 2020-030 Interconnection Ties for Individual Pile Caps and Caissons View
IB/P/BC 2017-116 Foundation Design for Expansive Soils View
IB/P/BC 2017-118 Guidelines for Stormwater Infiltration View
IB/P/BC 2017-105 Guardrail Requirements Adjacent to Openable Windows View
IB/P/BC 2017-011 General Illumination and Lock Requirements in Accordance with Ordinance View
IB/P/BC 2014-019 Exit illumination and Exit Sign Lighting Systems View
IB/P/BC 2020-034 Employment and Duties of a Registered Deputy Inspector View
IB/P/BC 2017-113 Contents of Reports for Submittal to the LADBS Grading Division View
IB/P/BC 2017-044 Exemptions from Liquefaction, Earthquake Induced Landslide, and Fault-rupture Hazard Zone Investigations View
IB/P/BC 2017-097 Early Start Permits View