Electrical Permit Forms & Publications

Image of Downtown Los Angeles

Search Forms & Publications

Hint: For best results, try searching by document number (e.g. "App.003-2014")

Note: Projects submitted prior to January 1, 2022 are subject to the 2020 LA City Codes -- see all updated documents on the 2020 Code Documents page.

Note: Projects submitted after January 1, 2017 must comply with the 2017 LA City Codes -- see all updated documents on the 2017 Code Documents page.


or Select by Topic

Code Amendment

Forms & Applications

ID   Title  
PC/ELEC/App02-2019 Application for Electrical Permit View
PC/ELEC/App03-2017 Application for Electrical Plan Check View
PC/ELEC/FeeSch1-2016 Permit Fee Schedule for Electrical Permits View

Information Bulletins

ID   Title  
LAFD Requirement 96 Solar Photovoltaic System View
LAFD Requirement 96 Fire Department Reference - Requirements For Rooftop Photovoltaic (PV) Systems on One and Two Family Dwellings View
IB/P/EC 2020-002 Procedures for Recognized Testing Agencies Performing Field Services View
IB/P/EC 2017-003 Multi-Building Complexes Electrical Plan Check Required View
IB/P/EC 2020-003 Multi-Building Complexes Electrical Plan Check Required View
IB/P/EC 2017-004 Inspection of Elevator Wiring View
IB/P/EC 2020-004 Inspection of Elevator Wiring View
IB/P/EC 2017-005 Rules and Regulations for LADBS Testing Laboratories View
IB/P/EC 2020-005 Rules and Regulations for LADBS Testing Laboratories View
IB/P/EC 2017-006 Permit Fees for Solar Photovoltaic Microinverters View
IB/P/EC 2020-006 Permit Fees for Solar Photovoltaic Microinverters View
IB/P/EC 2017-008 Standard for Lighting Fixture Supports View
IB/P/EC 2020-008 Standard for Lighting Fixture Supports View
IB/P/EC 2017-009 Temporary Decorative Lighting Above Streets and Sidewalks View
IB/P/EC 2017-010 Poles and Temporary Construction Power View
IB/P/EC 2020-010 Poles and Temporary Construction Power View
IB/P/EC 2017-011 Communication Public Utility Systems View
IB/P/EC 2020-011 Communication Public Utility Systems View
IB/P/EC 2017-013 Electrical Equipment (Product) Approval Requirements View
IB/P/EC 2020-013 Electrical Equipment (Product) Approval Requirements View

Requests for Modification

ID   Title  
PC/ELEC/Mod007-2017 Add Loads to an Existing Installation View
PC/ELEC/Mod007-2017 Add Loads to an Existing Installation View
PC/ELEC/Mod008-2017 Demand Factor of 0.65 to a Group of Reefer Receptacles View
PC/ELEC/Mod008-2017 Demand Factor of 0.65 to a Group of Reefer Receptacles View
PC/ELEC/Mod010-2017 Extend Plan Check Time View
PC/ELEC/Mod010A-2016 Extend Plan Check Time (for 2008 Codes) View
PC/ELEC/Mod010A-2016 Extend Plan Check Time (for 2011 Codes) View
PC/ELEC/Mod010A-2017 Extend Plan Check Time (for 2011 Codes) View
PC/ELEC/Mod010A-2017 Extend Plan Check Time (for 2014 Codes) View
PC/ELEC/Mod013-2017 Installation of Equipment Prior to Test Lab Approval View
PC/ELEC/Mod013-2017 Installation of Equipment Prior to Test Lab Approval View
PC/ELEC/Mod014-2017 Separate Approval for Fire Life Safety Plans View
PC/ELEC/Mod015-2017 Separate Fire Alarm Plans View
PC/ELEC/Mod015-2017 Separate Fire Alarm Plans View
PC/ELEC/Mod016-2017 Use a Scale per Foot Smaller than 0.125 Inch for Site Utility Drawing View
PC/ELEC/Mod016-2017 Use a Scale per Foot Smaller than 0.125 Inch for Site Utility Drawing View
PC/ELEC/Mod041-2017 Separate Approval for Fire Life Safety Plans View
PC/ELEC/Mod054-2017 Conduit Only Permit (Early Start Permit) View
PC/ELEC/Mod054-2017 Conduit Only Permit (Early Start Permit) View
PC/ELEC/Mod059-2016 MC Cable Only Permit (for 2011 Codes) View
PC/ELEC/Mod059-2017 MC Cable Only Permit View
PC/ELEC/Mod059-2017 MC Cable Only Permit View